Construction methodのメーカーや取扱い企業、製品情報、参考価格、ランキングをまとめています。
イプロスは、 製造業 BtoB における情報を集めた国内最大級の技術データベースサイトです。

Construction method(frp) - メーカー・企業と製品の一覧

Construction methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Water Treatment Facility (Wastewater Treatment Tank) Jickboard T Method

Introduction to the sheet lining method with high durability, which allows for easy construction and reduced construction time.

The technology is a corrosion protection method for the interior surfaces of tanks that can be applied even on wet surfaces or in high humidity conditions. After applying a special mortar to the concrete structure or after section repair, a jig board is pressed onto it immediately after application, achieving full adhesion with the concrete structure. This method eliminates the need for support materials, allowing for a shortened construction period. Additionally, FRP molded products are installed with a corrosion-resistant sealing material to create a double structure, providing high durability that prevents damage to the joint areas. 【Features】 ■ Can be applied on wet surfaces or in high humidity ■ Easy application reduces construction time ■ No need for support materials ■ The special mortar for adhesion can bond to wet surfaces of the concrete substrate *For more details, please refer to the PDF materials or feel free to contact us.

  • others

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録